Loading of the bearings at manufacturer in Lippstadt
Precarriage from Lippstadt to Gelsenkirchen

TUNNEL BORING MACHINE TO SPAIN

Some logistical key points

Project size: Tunnel boring machine parts up to 70 tons+ equipment with a bearing of 8.40m diameter and 1.60m height

Scope of services

  • Logistics project management
  • Transport-/ packing consulting
  • Precarriage ex Lippstadt with truck to river port
  • Transport with barge to Rotterdam
  • Sea transportation to Alicante
  • Oncarriage to construction site with truck to Madrid (M30)
  •