Road transport of the turbine from seaport to job site.
Offloading of the generator using a 800 tons shore crane

POWER GENERATION PLANT TO SPAIN

Cargo Description

  • 1 Generator, 9,000 x 4,010 x 3,430 mm / 113,010 kg
  • 1 Condensor, 12,130 x 5,420 x 4,360 mm / 107,920 kg
  • 1 Turbine, 10,080 x 6,450 x 4,540 mm / 183,557 kg
  • General Cargo 900 cbm

Project Description

Combined transport by river barge and trucking from German work shop to seaport of Rotterdam; Transshipment into coaster vessel with floating crane; Ocean transport by full charter to Huelva; Offloading with shore crane; transport to site by road by 16 axle trailer; Foundation delivery of all main components.