162 tons gasifier - precarriage from site to Eisenhüttenstadt by a 14 axle lift-lever vessel bridge
162 tons gasifier before being dismantled

GASIFIER TO INDIA

Some logistical key points

  • Project size: 5,200+ Frt, incl. overdimensional and H/L up to 162 tons and 1,100 to steel structure
  • Project period: Feb. 2010 – Jul. 2010

Scope of services

  • Logistics project management
  • Transport-/ packaging consulting
  • Internet-based project monitoring/ tracking + tracing with LPconnect!
  • Site coordination during the dismantling process incl. packing and cleaning - wherever required
  • Precarriage to sea port by truck and barge
  • Temporary storage at port
  • Route survey for oncarriage in India (Haldia/ Paradip port to site, Haldia)
  • Sea transportation from Bremen to Haldia